1. A (5+2) working day configuration, which meaing 5 workdays and 2 day off on Sat and Sun, is system defalut setting for a Workday Scheme.
2. Both workday and off-day are included in Default Scheme settings.
3. Configure working day for selected project
For example, there are two projects: TIMESHEET PROJECT and MY TEST PROJECT. The former one go with a Default Scheme, a (5+2) working day configuration. However, the later project has a scheme with (6+1) configuration attached. On their Workday Scheme basis, you will see the difference on the screen as below.
- TIMESHEET PROJECT: all Saturday and Sunday are marked as day off.
- MY TEST PROJECT: only Sunday is marked.