1、Function description

 You can drag and drop plans through this function to generate periodic plans.

2、Function on

When entering for the first time, the dragging function of working hour plan range is off. Click the (··) in the upper right corner,Display the information in the drop-down list, click the "plan drag" button to open the drag function of work hour plan range.

3、Function use

 3.1 Click and hold, and slide to select the required time range of man hour plan.

When the mouse is released, the system will automatically obtain the start time and end time of the selected time range

3.2 The start time of work plan must be less than the end time, otherwise the selection of work plan time range fails


 3.3 When you release the mouse, you must specify the correct end time, otherwise the selection of work plan range fails

   ① Correct release to obtain end time range

   ② Releasing the mouse will fail the selection and clear the selected plan


 3.4 If the sliding range exceeds the expected end time, slide back


 3.5 The time plan drag is only for 3 (issue), if it is 1 (user), or 2 (project) time plan range selection fails

3.6 In the dragging process, if there is no change to the planned color, the system will automatically complete all colors after the mouse is released