Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

2.2.1 Creating a New Work Plan/Log

There are two ways to create a work plan or work log:
    (1)From (1) From the issue list on the right, drag and drop the issue to the calendar on the left.       Image Removed
    (2)Mousing

...

(2) Mousing over a certain day will make the option to create a new work log or work plan appear:       Image Removed

...


Using the either of the above two methods, the dialog to create a new work plan or log will appear.                 

...