1、Function description
You can drag and drop plans through this function to generate periodic plans.
2、Function on
...
1. Description
This feature is used to batch create period work plan via dragging.
2. How to turn it on
This feature is off by default. You can click the (··) in the upper right corner ,Display the information in the for a drop-down list, click the "plan drag" button to open the drag function of work hour plan range.
...
...
then turn on "Drag to create plan" to start.
...
3. How to use
3.1 Click and hold, and slide to 1 Click and select the required time range of man hour plan.date of worklogs. When the mouse is released, the system will automatically obtain the start time date and end time of the selected time range
3.2 The start time of work plan must be less than the end time, otherwise the selection of work plan time range fails
3.3 When you release the mouse, you must specify the correct end time, otherwise the selection of work plan range fails
① Correct release to obtain end time range
② Releasing the mouse will fail the selection and clear the selected plan
3.4 If the sliding range exceeds the expected end time, slide back
3.5 The time plan drag is only for 3 (issue), if it is 1 (user), or 2 (project) time plan range selection fails
3.6 In the dragging process, if there is no change to the planned color, the system will automatically complete all colors after the mouse is releaseddate, repeat every day.
...
3.2 Start date must be earlier than end date, otherwise it will fail.
...
3.3 Drag is only effective for Issue(3). For User(1) or Project(2), it does not work.
...
3.4 If “Maximum logged hours per person per day“ is enabled in global settings:
...
① If daily recorded hours are equal to maximum allowed hours, no hours will be planned and a prompt will pop up.
Plan 3h
...
② If the remaining allowed hours are less than the hours to be planned, It will automatically plan maximum allowed hours.
...
plan 3h
...