You can drag and drop plans through this function to generate periodic plans.
2、Function on
...
1. Purpose
This feature allows you to drag and drop work plans to quickly duplicate plans.
2. Enabling the feature
This feature is off by default. Navigate to the TimeWise drop-down from the topbar and click Time Sheet. Click the (··) in the upper right corner, Display the information in the drop-down list, click the "plan drag" button to open the drag function of work hour plan range.
...
3、Function usethen check the box by "Time Plan Drag" to enable the feature.
...
3, Usage
3.1 Click and hold , and slide to select the required time range of man hour planan existing workplan node, then drag your mouse to the desired spot.
When the mouse is released, the system will automatically obtain the start time and end time of the selected time range
...
3.2 The start time date of work plan must be less than before the end timedate, otherwise the selection of work plan time range failswill return an error.
...
3.3 When you release the mouse, you must specify the correct a valid end timedate, otherwise the selection of work plan range fails ① Correct release to obtain end time rangeor the process will fail
① Drag the mouse to the desired location
② Releasing the mouse outside the time sheet will fail the selection and clear the selected plan
...
cancel the process
...
3.4 If the sliding range exceeds the expected end time, slide back
...
3.5 The time plan drag is only for 3 (issue), if it is 1 (user), or 2 (project) time plan range selection fails
...
3.6 In the dragging process, if there is no change to the planned color, the system will automatically complete all colors you accidentally dragged your mouse too far, you can always drag it back (left).
...
3.5 This feature only works with Issues(3). If the selected workplan is under a User(1) or a Project(2), the process won’t go through
...
3.6 The correct colors won’t update during the dragging process but only after the mouse is released.
...