1. Description
This feature is used to batch create period worklog work plan via dragging.
2.
...
How to turn it on
This feature is off by default. Navigate to the TimeWise drop-down from the topbar and click Time Sheet. Click You can click the (··) in the upper right corner for a drop-down list, then check the box by turn on "Drag to create plan" to enable the featurestart.
...
3
...
. How to use
3.1 Click and hold an existing workplan node, then drag your mouse to the desired spot.1 Click and select the date of worklogs. When the mouse is released, the system will automatically obtain the start time date and end time of the selected time range
...
date, repeat every day.
...
3.2 The start date of work plan 2 Start date must be before the earlier than end date, otherwise the selection will return an error.
...
3.3 When you release the mouse, you must specify a valid end date, or the process will fail
① Drag the mouse to the desired location
② Releasing the mouse outside the time sheet will cancel the process
...
3.5 This feature only works with Issues(3). If the selected workplan is under a it will fail.
...
3.3 Drag is only effective for Issue(3). For User(1) or a Project(2), the process won’t go through
...
3.6 The correct colors won’t update during the dragging process but only after the mouse is released.
...
3.7 Limit plan hours
...
① The daily entered plan is equal to limiting the planned hours, does not fill in, and prompts.
Enter 3h
...
② Daily time-consuming plus entered plans are greater than the limit plan and are automatically deducted and reported.
...
Enter 3h
...
it does not work.
...
3.4 If “Maximum logged hours per person per day“ is enabled in global settings:
...
① If daily recorded hours are equal to maximum allowed hours, no hours will be planned and a prompt will pop up.
Plan 3h
...
② If the remaining allowed hours are less than the hours to be planned, It will automatically plan maximum allowed hours.
...
plan 3h
...